New outdoor pool with lap lanes and shaded seating at the Jewish Community Center of Greater Columbus in Bexley, Ohio, designed by Meyers+Associates.

JCC Aquatics and Pickleball

The Jewish Community Center of Greater Columbus has expanded its aquatics complex and added a pickleball complex for the families, swimmers, and regulars who use the building every day.

Share on social
Aerial view of the Jewish Community Center's new outdoor pool and pickleball facility with outdoor courts. Architecture and interior design by Meyers+Associates

The outdoor pool is new, about 6,700 square feet beside the indoor pool that stayed. A zero-depth entry gives young swimmers an easy start. Lap swimmers get a deep end. Two 18-foot slides give the older kids a reason to stay. The deck seats 154, which means people come for the afternoon, not just the swim.

The pickleball complex puts twelve courts under one roof. Players can sit between games at tables near the concessions stand. The building was designed in a pre-engineered steel frame with blue and cork finishes, so it sits comfortably next to the existing center.

New pickleball facility with indoor and outdoor courts at the Jewish Community Center of Greater Columbus in Bexley, Ohio, designed by Meyers+Associates.
Retail area in the new pickball facility at the Jewish Community Center of Greater Columbus in Bexley, Ohio, designed by Meyers+Associates.
https://meyersarchitects.com/wp-content/uploads/2026/11/meyers-associates-jcc-bexley-pool-04.jpg
https://meyersarchitects.com/wp-content/uploads/2026/11/meyers-associates-jcc-bexley-pool-02.jpg
https://meyersarchitects.com/wp-content/uploads/2026/11/meyers-associates-jcc-bexley-pickleball-03.jpg

We first worked with the JCC in 2013, on a fitness expansion. Over the years we’ve learned how the building is used from early morning to late evening, and that shaped these spaces. A pool used by swim lessons, lap swimmers, and a Saturday birthday party needs more than one layout. The same goes for courts that have to handle league play and open play on the same day.

None of it could start until the site had a water line it never had. Bringing water in meant a new tap, a route through a campus that stays open every day, and abandonment work the city required before construction could move forward. The city reviewed the water service plan seven times. The critical connections were finished on weekends so the center could keep running on weekdays.

Let’s connect

  • CityHilliard, Ohio
  • Client Jewish Community Cener of Greater Columbus
  • Year Completed 2026
  • Size of Project 21,620 SF
  • Collaborators Osborn Engineering, Patterson Pools, CK Construction